Saturday, July 3, 2010

Progress

All of the outside walls have been weedeated. The boards with the
holes are frieze boards. They cover the open space between the walls
and the roof. I drilled two inch holes for ventilation and stapled
wire mesh behind them. I calculated the exact number of holes for the
volume of the roof space. We also found a source for clay for the
adobe. The last picture is our clay. We got it from a well know
pottery company in the area. Clay City Pottery, in Clay City. I figure
they must have good clay with a name like that.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.